The implementation of MRP II in two Brazilian industries
Palavras-chave:
MRP II, Linear programming, Queue theory, Production and planning control, Hybrid modelResumo
This paper presents the implementation process of the MRP II – Manufacturing Resource Planning – in two Brazilian factories, and reports on difficulties in programming and controlling the shop floor in make-toorder and assembly-to-order environments. It proposes a formal architecture for a production planning and control system by using hybrid systems, including Linear Programming, Queue Theory and Kanban System. Suggestions are presented on how to improve the in-plant logistic performance considering the client service and the minimum production cost.Downloads
Não há dados estatísticos.
Downloads
Arquivos adicionais
Publicado
2008-09-25
Como Citar
Vitorino, C. M., & Terra, L. D. B. (2008). The implementation of MRP II in two Brazilian industries. Revista Economia & Gestão, 2(4). Recuperado de https://periodicos.pucminas.br/economiaegestao/article/view/103
Edição
Seção
Artigos